Project Details:Owner:Middle East Kimiaye Pars Co. (MEKP) Project Location:Assaluyeh (Phase II) Technical Category: Petrochemical Stakeholders: Navrood , Bonizsaze and … Construction Companies Project Status: On-going |
|
Responsibility:Rendering basic, detail and site engineering services including flare routs, utilities, electrical, instrument and substation for Bushehr, Kimiaye Pars, Apadana and Dena petrochemicals as the main stakeholders of the Project. Main Features: Kimiaye Pars: 1 flare line (56“) for the total length of 1400 meter Dena: 1 flare line (60 “) for the total length of 1400 meter Apadana: 1 flare line (36 “and 44”) for the total length of 1300 meter Bushehr: 3 flare line (36”, 42“and 60”) for the total length of 3100 meter |