Damavand Petrochemical Utilities & Offsite
Engineering Services (Basic, Detail& Procurement Services)
Project Details:Owner: Damavand Petrochemical Company Project Location: Assaluyeh (Phase II) Technical Category: Petrochemical Stakeholders: Sazeh Consulting Eng. Different Contractors Project Status: On-going |
|
Responsibility:Conceptual design review prepared by N.P.C Generation & updating general plot plan Basic & detail design (Infrastructure, Offsite, Flare area and Waste Water Treatment) Study of the capacity and location of utility plants. Main Features: Generalities -Excavation volume: 40,000,000 M3 -Earth Fill (terracing): 2,000,000 M3 -Reclaimed Area: (330 Ha) -Earth Fill: 38,000,000M3 -Maximum Depth of Reclamation: 14 m – Total length of break waters: 7.5 km Marin Works -5 Berth -1800 m Break Water -Depth Basin -15 CD -Length of Approach Channel 2.2 KM Electrical Sub-stations -5 * 230/20 KV Substation -1* 400/230 KV Substation -1* 230/132 KV Substation -HV Cable: 138 KM -MV Cable: 485 KM -LV Cable: 836 KM -Electrical Gallery: 8 KM Fuel and Feed Gas Station -Feed Gas 2,000,000 (NM3/H) -Fuel Gas 1,200,000 (NM3/H Non Industrial Area -Work Shops: 25,000 M2 -Ware Houses: 2,000 M2 -Fire Brigade Stations: 2 * (FBS 3600 M2) Interconnection and Corridors -Inter Connecting Corridors: 25 KM Flare Area -Flare Stacks: 34 Stack -Flare Pipe Routes: 70 KM Power Plant -12 GTG * 62 MW – 5 HRSG * 330 T/H -2 AUX Boilers * 120 T/H Water Center – Water Intake: 80,000 M3/H -RO Desalination Unit: 400,000 M3/D -DM Water: 75,000 M3/D -CPP: 74,000 M3/D -Fire Water Pump Station: 800 M3/H -Potable Water Tanks & Pump Station: 300 M3/H -Service Water Tanks & Pump Station: 500 M3/H ASU Plant -10*73,000 NM3/H WWT and Incineration -C.O.C: 1,700 M3/H -P.O.C: 760 M3/H -S.N: 100 M3/H -Liquid Base: 15,000 Lit/H -Solid Base: 1,000 KG/H Roads and Pipe racks -Roads: 45 KM -Asphalt Paving: 575,000 M2 -Surface Water Canals: 65 KM -Structure: 40,000 T -Concrete Works: 600,000 M3 Fire Fighting Stations -4*4000 M3/H (Minimum) FFPS -About 50 KM Fire Water Pipes (UG) Reclamation – Total reclamation area: 330 Ha -Volume of rock works: 15,000,000 M3 -Volume of earth fill: 38,000,000 M3 |